has received multiple orders from the Adani Group aggregating to ₹469 crore for the execution of the Balance of System (BOS) package for a 250 MW Solar Power Project at Khavda, Kutch, Gujarat.
The orders have been awarded by Adani Green Energy and Adani Green Energy Six and involve the supply of goods and on-site services for the BOS package. The project is scheduled to be executed within eight months from the receipt of the order.
With this latest order win, Hyderabad-based Bondada Engineering’s cumulative project capacity with Adani Group has reached about 1GW, further strengthening its position in Bharat’s rapidly expanding renewable energy infrastructure sector.
“This order reinforces our strong and growing partnership with the Adani Group and reflects the trust placed in Bondada Engineering’s execution capabilities in the renewable energy sector. As Bharat accelerates its clean energy transition, we remain committed to delivering high-quality infrastructure solutions that contribute meaningfully to the country’s renewable energy ambitions,’’ Bondada Raghavendra Rao, Chairman & Managing Director, Bondada Group, said in a release.
